WHERE DID THE BRIDGE GO ?

Ft Loudoun Dam has a totally different look…

Ft Loudoun Dam New Look

All traffic is now shifted from the U.S. Highway 321 bridge atop Fort Loudoun Dam onto a new, four-lane bridge 2,000 feet downstream, marking a milestone in a $71 million project.

Now  the J. Carmichael Greer highway bridge has been removed from over the dam …. It is all gone.

The look from above the dam is SOMETHING IS MISSING.

Facebooktwitterlinkedin